Contact Us

Ready to Get Started?

Our experienced Account Executives begin by first listening to our client’s needs and finding out what makes them unique. By listening and discussing with the client the image they are trying to project, we can create strong logos and work to develop a sign branding program.

Hayes Design Co Favicon

Address

1247 E Mishawaka Ave, South Bend, IN 46615

Email

info@hayesdco.com
or fill out the form below

Phone Number

+1 (574) 236-5615

Contact Us

Tell us About Your Project

Use the form below to quickly send us a message.

FAQ

Here are some answers to Frequently Asked Questions.

How much lead time should I give when ordering a sign?

Signs are one-off custom fabricated so they take longer to make than you think so keep that in mind if you have set open dates to provide your sign vendor at least a 4-6 weeks lead time.

How do I know what sign type I’m allowed to have?

Signs are restricted by each local municipal code. Have your sign professional perform a code check to see what size sign you are allowed. Just because your neighbor has a large sign does not mean you will be allowed one as codes are constantly changing.

Do I have to have my sign installed in Spring or Summer?

We work in all four seasons….don’t be afraid to buy a sign in the winter.

How should I send you my logo file?

If you have a logo we will need it in a vectored format (.ai or .eps). No logo? No problem! We can work with you to create your brand from scratch.

How big should my sign be?

You will need a larger sign than what you think, rely on a quality sign professional to use their traffic analysis to tell you what size sign you need to be legible from the roadway. If you need a variance for a larger than code allowed sign we can represent your business/organization.

How long does it take to design a sign?

Design time can range from 1-3 days depending on project scope.

What happens if I buy a low-cost/quality sign?

A low-cost, poorly made sign will cost a lot more in service, maintenance, and lifespan versus buying a quality product.

How long does permitting take?

Once a proposal is signed, permitting can take between 3-5 days.